Light lunch in our garden as we enjoy the last few days of summer, the wisteria surrendering its final floral flourish before the imminent autumn pruning.
The apennines on the horizon will soon show their first sprinkling of snow and winter will be on its way … reminding us how blessed we are by seeing, experiencing and enjoying the rich variety of colours, textures, views and temperatures each new season brings in a way never possible in our previous city-based lives … thank you Lord!

Lounge Diner

Furniture, furnishings and accessories make the apartments feel very much like home … we really love the character and atmosphere created by combining 200 year old features with modern loft-apartment styling.


The relaxed seating will encourage afternoon ‘siesta’ as well as long philosophical discussions on warm summer evenings … no doubt fueled by one or two bottles of well chilled local wine.


A well equipped kitchen will encourage guests to experiment with their own version of Pasta Carbonara … followed by the unique flavour and texture of oven grilled Boar and Pork sausages handmade by the local butcher.


Easy wipe-down surfaces and built-in dishwasher allow meals to be quickly cleared  before the serious business of relaxing can begin … and ‘domani’ is still a long way away!





















Thursday, 30 August 2012

Kitchen Creations

Impressive performance from the local kitchen suppliers … two complete kitchens delivered, assembled and installed yesterday from scratch in six hours by two very hardworking fitters.


Base carcasses in place for the smaller apartment.


Mirror installation in place for the larger apartment.


Dishwasher and sink as fitted in the smaller apartment.


The oven and extract hood remain to be connected and fitted by the electrician.


Likewise with the larger apartment … dishwasher and hob in place.


Freestanding fridge-freezer will be where the oven is … waiting to be fitted by the electrician.  







Monday, 27 August 2012

Window Dressing


As soon as the decorators finish … cool white throughout … the carpenter arrives to fit custom made windows, each perfectly dimensioned to the wide variety of structural openings that exist in the building.


Why does a view always look so much better through a beautiful window?


Full height double glazing to french doors maximises, where possible, light in and views out


All window frames are in finest quality douglas fir with a clear varnish to match the golden honey yellow of the external venetian shutters and doors.


Solid shutter doors, bolts and mortice locks provide security and ensure privacy for the main entrance doors to each of the apartments …


… while all glass panes are latest regulation double glazing with enhanced acoustic and thermal properties to conserve energy and limit the intrusion, if required, of the sometimes deafening cicada chorus on hot summer nights!

Tuesday, 21 August 2012

Sealing up the Ceiling


Unfortunately the ground floor ceilings had been stripped of original timber beams and any traditional character many years ago … all replaced with cast concrete beams and extruded baked clay infill panels … extremely utilitarian. 


Limited headroom and budget prevents re-introducing ceiling timbers so the only practical option is to plasterboard all ceilings tight to the existing soffit structures, ensuring lighting and power circuit conduits are all in place before sealing up the ceilings.


Immediately the various rooms look very different and far more finished than before … final plaster skimming and decorating will follow shortly.


Heating pipes and extract ducting are hidden behind a dropped bulkhead above the future corner kitchen area.


In just one week all ceiling areas have been closed off and prepared for final finishes and decorations … just hope the electricians can find the conduit once the ceilings have been taped, skimmed and painted!







Monday, 16 July 2012

Getting Floored


About 300 square meters of tiles are delivered … get ready for laying!


Floor areas in the two ground level apartments are to be finished with large format (30 x 45 cms) rustic hand-finished, natural clay colour, ceramic tiles.


Once the main datum lines are set the tile laying begins …


Tiles are laid in a contemporary linear bond with grid lines centered on the brick archway and, where possible, with primary entrances and passageways.


We love the subtle variety of colours in the natural clay finish …


… which matches beautifully the original brickwork of the main archway.


Tiled steps lead from the main apartment down to the second living area …


… where the shape and proportions of this smaller apartment are best complimented by the main grid running in the opposite direction.


All these areas look so much bigger now the floors are laid …


… including bedrooms such as this double room in the smaller apartment.


The same tiling extends throughout including to the bathrooms …


… where matching tiles of a more elegant linear format (45 x 15 and 30 x 15) are used on the lower half of the bathroom walls.


Walk-in showers are accentuated by large scale natural stone colour mosaics …


… with made-to-measure glass enclosures to be fitted later.
It’s all beginning to look and feel much more finished … at last!





Sunday, 15 July 2012

Wonder Waxing


After sandblasting all the roof timbers needed treating and waxing. With the help of a willing nephew (Jonny Lummis) this was completed over several hardworking days.


Initially wary of heights, Jonny soon gained confidence and tackled this painstaking task with a big smile … and considerable rather questionable humour.


It’s surprising just how many individual three-sided ceiling joists there are between the main roof beams! Each one had to be dusted, termite treated, left to dry for 24 hours … then waxed!  
Ideally … with no brush marks left on the tile surface!

The toughest challenge proved to be reaching the very apex of the main roof … a good five meters or more above floor level. The only way, with a 2.5 meter scaffold tower, was with a brush taped to the end of a long curtain rail.


Just a few strokes left to complete the job … Jonny is looking particularly pleased that the end in finally in sight. A well deserved glass (… or two!) of chilled white wine awaits.
Thanks Jonny … the results are great and the roof timbers now look wonderful.